Basic Engineering Design (BED) Snapshot
Basic and detailed engineering to increase by 3% the recuperation capacity of the molybdenum plant. The basic engineering started in March 2012 and was successfully completed with the modifications of the existing plant, the investment estimate (CAPEX) and the documents required for the procurement of the main equipment.